Murray Basin Douglas Mineral Sands

Krueger Engineering manufactured structural steelwork and tanks for the South-Western Victorian mineral separation plant.

Included in the scope were specially designed surge tanks, launders and settling tanks with a combined weight of over 100 tonnes.

The mining facility is designed to be relocated by road, including the tanks with can be dismantled and transported with minimum impact.

Over 500 tonnes of structural steelwork was manufactured and supplied for the processsing plant.

Due to the tight construction schedule, our manufacturing operations worked two 12 hour shifts over the period of the contract to meet the erection crew's requirements.