Prominent Hill Gold-Copper Mine

Krueger Engineering manufactured a variety of tanks for this major venture in the north of South Australia.

Included in our scope was the manufacture and supply of eight process tanks and four panel tanks, together with the erection of two thickeners.

Krueger Engineering field assembled the two larger tanks which were 12.1m diameter x 15m high and a 23m and 45m diameter thickener. To minimise site activities and reduce overall costs to the client, Krueger Engineering elected to manufacture the six smaller tanks off site and transport them by road to site. These tanks were of various sizes up to 6.8m diameter and 10m high.

Krueger Engineering met all of the client's critical dates and performed the contract without any lost time injuries or disruption to the works, drawing high praise from the client and other contractors on site.